The “Giessen” office building joins an existing LLB building to form a campus in a central location in the Principality’s capital.
DENSIFICATION IN THE CITY CENTRE
The “Giessen” house is located in the Äule district of Vaduz, the capital of Liechtenstein. It is directly adjacent to the “Städtle” (historic centre) in the vicinity of Äulestrasse, a former through road that runs along the mountain flank below Vaduz Castle. In the 1950s , this central area began expanding westwards from Vaduz toward the Rhine valley plain. Where orchards once grew now stand a range of government buildings, a cultural centre, a primary school, shops and commercial buildings. Much of the Städtle is made up of a pedestrian zone which extends into the neighbouring Äule district. The name Giessen comes from the Giessa, a small waterway that flows northwards underneath Giessenstrasse just west of the site.
For the client, Liechtensteinische Landesbank AG (LLB), the “Giessen” house is the result of a strategic decision made in 2018. Following a comprehensive analysis of the bank’s building portfolio, the Executive Board decided on clear centralisation of its business premises in Vaduz. On the former site of the Office of Justice, the bank has created a modern campus encompassing the existing headquarters, the “Äule” house, and to the immediate north the new “Giessen” house – right in the heart of the country. For the client it was important that the new build harmonise with the urban fabric and foster a sense of connection with the entire population. Community facilities and an auditorium were included on the ground floor, making the campus a new, easily accessible meeting place.
SPATIAL DIVERSITY WITH A RATIONAL GRID
The five-storey “Giessen” house, with its nearsquare footprint, accommodates around 260 workstations, flexible room types, and areas for concentration, collaboration and exchange. The free-standing building is connected to the adjacent “Äule” house via a bridge from the second and third floors. On the two subterranean levels, the fabric of the predecessor building was partially modified and reused, for example in the area of the stairwell and the lifts. The extension of the subterranean levels provides more space for the existing underground car parks and accommodates technical rooms.
The main entrance to the building is on the south side, under the bridge that leads to the “Äule” house and behind an arcade that extends from the south façade to the east façade. Upon entering, users and visitors to the building encounter a spacious foyer area with reception desk. The auditorium is directly accessible via the foyer. It is positioned on the longitudinal axis of the volume, adjacent to the west façade, and can be divided in the transverse direction by mobile partition walls.
The compact service core with stairwell, two lifts and toilet facilities is located east of the auditorium. Like the auditorium, it is designed as a symmetrical structure with rounded corners and is positioned along the longitudinal axis. A wide lobby extends between these two spaces.
At the first-floor level, a garden courtyard opens out above the auditorium, bringing daylight to the interior of the building. On the first and fourth floors, this open space extends to the west façade as a terrace and as an open-air “bridge”, respectively. The regular orthogonal column spacing of the skeleton structure, with centre-to-centre distances of 5.4 metres, allows for flexible layout of the office floors; the halved centre-to-centre distance of the façades complements this arrangement, enabling a rational division of the levels. Symmetrically arranged secondary service cores in the western part of the volume house an emergency staircase and a goods lift. Between them and the inner garden courtyard façade is a small kitchen on each level.
TIMBER-CONCRETE HYBRID CONSTRUCTION
Sustainability is an important core element of LLB’s strategy. From the planning and construction phase through to commissioning and regular operations, sustainability has been a consistent priority of the “Giessen” house project. From a structural point of view, it is a timber-concrete hybrid construction from the ground floor up, with timber columns and beams supporting recycled concrete ceilings. This structure is clearly visible from the interior and is also reflected in the extensively glazed façade, which uses prefabricated timber wall elements, timberand-metal windows and exterior cladding made of Alucobond and pre-weathered timber.
Heating, cooling and ventilation as well as general air conditioning are provided by a heat pump and special system ceilings. A large-scale photovoltaic system on the roof supplies electricity. As a green building, the “Giessen” house received LEED GOLD certification. It complies with the Minergie-P ECO standard. The term “Giessen” refers to a slowly flowing body of water. One such waterway, the Giessa, runs directly alongside the new build.
This had an impact on the implementation planning, the underground technical measures and the challenges for the construction team. The excavation pit was secured with an overlapping bored pile wall, with ground improvement works that will provide longterm ground stabilisation. Four filter wells are used to lower the groundwater level. The “Giessen” house is built on deep foundations with tension piles. The handover included a BIM2FM transfer.